East of Phase II of the Jinshan Power Plant and north of South Thermal Power Plant Street, Taige Mu Town, Tu Left Banner
Release time:
2022-07-27
number:
Tuzhou Land Reserve Notice No. 38, 2022
Listing
Mode of transfer
50.0 years
Years of assignment (years)
形值.形形
Total area (acres)
Other land uses
planned use
¥值.形前M
starting price
Basic information
Current Area
Inner Mongolia-Hohhot-Tumed Left Banner
Building density
30.0 ≤ Building Density
Green ratio
Green space ratio ≤ 20.0%
placement
East of Phase II of the Jinshan Power Plant and north of South Thermal Power Plant Street, Taige Mu Town, Tu Left Banner
Plot ratio
0.5 ≤ Floor Area Ratio
Floor Area
Empty
Limit height
0.0 meters
localities
East of Phase II of the Jinshan Power Plant and north of South Thermal Power Plant Street, Taige Mu Town, Tu Left Banner
Transaction information
Tumed Left Banner price trends