Investment Specialists
Binding Unit
Zhai Jiayu Business Development Representative
correct
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Call
For Lease
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | Building | |
|---|---|---|---|---|---|---|
![]() | ||||||
For Sale
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | Building | |
|---|---|---|---|---|---|---|
![]() | ||||||
Development Zone Introduction
The Baotou Kundulun Economic and Technological Development Zone is located south of the G6 Expressway, west of the Baotou Iron & Steel Group (Baosteel) plant, east of the Southern Ring Road, and north of the Baotou-Lanzhou Railway. As a key industrial park at the autonomous region level, it has a planned area of 110 square kilometers, with 37 square kilometers approved for development by the autonomous region.It has received numerous honors, including “National Demonstration Base for New Industrialization in Steel and Deep Processing,” “National High-Tech Industrialization Base for Steel and Rare Earth Deep Processing,” “National Outstanding Logistics Park,” “Inner Mongolia Autonomous Region Green Manufacturing Demonstration Park,” and “Inner Mongolia Key Industrial Park for High-Quality Development.”The developed area of the Economic and Technological Development Zone covers 25.5 square kilometers, with 20 square kilometers of land having been leveled. Over the past three years, the zone has constructed, renovated, or expanded 26 roads totaling 48.5 kilometers. It has coordinated the construction of 30.13 kilometers of pipeline networks for stormwater, sewage, water supply, reclaimed water, and natural gas, while completing 225,000 square meters of pavement along roadways and 374,000 square meters of landscaping.A total of 7,194 mu of land has been acquired and reserved, with the "nine utilities and one leveling" infrastructure largely in place, effectively ensuring the implementation of key projects and the normal operations of enterprises within the Economic and Technological Development Zone.At the same time, the Economic and Technological Development Zone has prioritized the implementation of rectification measures following ecological and environmental inspections by central and autonomous regional authorities. It has established automatic air quality monitoring stations, significantly enhancing real-time monitoring capabilities; constructed a solid waste temporary storage facility with an annual waste residue processing capacity of 85,000 tons; and built a sewage treatment plant with a daily treatment capacity of 30,000 tons, achieving phased results in the creation of a “waste-free urban area.”
Transportation Location
Return to location
- Highway
- Port
- Airport
- Logistics
- Life
region
trade
medical
school
travel















