In order to deeply implement the provincial construction department "on further doing a good job of residential project quality enhancement notice" (浙建质安发[2023]108号)、"Ningbo Municipal Housing and Urban-Rural Development Bureau on the Carry out in 2024 the city's residential engineering quality enhancement of special management action notice" (Yongjian letter [2024] No. 24), to further strengthen the region's residential engineering quality management, improve the level of quality of residential projects, and focus on solving the people's urgent and difficult to worry about the quality of the residential projects, I decided to carry out in 2024 the region's residential engineering quality enhancement of special management action, the specific program is as follows:
One, the rectification goal
To Xi Jinping, general secretary of the important exposition on quality and safety work as a guide, the full implementation of the spirit of the twentieth CPC National Congress, insisting on the "two supreme ", around the "two fundamentals", establish the concept of high-quality development, focus on social hot spots, pain points, difficult points, highlighting the governance of common problems, layers of solid responsibility, strengthen the quality control of engineering entities, vigorously promote the standardization of construction quality, to achieve the level of quality of the region's residential projects significantly improved, residential quality complaints significantly reduced, the quality of tenants significantly reduced. The quality of residential engineering quality level significantly improve, residential quality complaints significantly reduce, households quality satisfaction significantly improve, and constantly enhance the people's sense of access, happiness, sense of security.
Second, the scope and focus of rectification
(a) the scope of rectification: the region's residential projects, including commercial housing, resettlement housing and other residential projects, as well as other construction projects for residential functions.
(2) Remediation focus: into the field of materials, cracking and leakage, external wall insulation falling off, full decoration, community outdoor drainage pipes and other residential engineering quality common outstanding problems.
Three, the main task
Conscientiously implement the Municipal Bureau of Housing and Urban Renewal "on further strengthening the quality of residential construction management of a number of measures" (Yong Jianfa [2022] No. 19), the strict implementation of the construction of units of the project quality of the primary responsibility. Responsibility, highlighting the main responsibility of the construction unit, comprehensively strengthen the management of incoming materials, cracking and seepage, external wall insulation falling off, ready-mixed concrete quality, full decoration quality, community drainage.
(a) Strictly implement the construction unit primary responsibility. Construction unit is the first person responsible for the quality of the project, according to law on the quality of the project to assume full responsibility, fully responsible for the outstanding issues of residential quality governance. Ensure a reasonable duration and cost, and strictly prohibit blindly rush the schedule, grab the progress; strengthen the key parts, the key process of quality inspection; strict implementation of the project quality entity detection and functional test system; seriously organize and carry out household acceptance, owners open day, completion acceptance and quality information publicity system.
(ii) Effectively improve the quality of detail design. Design units should be based on the requirements of the relevant technical standards and specifications for residential engineering quality common outstanding issues raised specific detail construction, node practices and control measures, the design depth should meet the needs of construction; to encourage the selection of priority seepage resistance, crack resistance, sound insulation and other performance of building materials and technology practices.
(C) highlight the construction quality control. Construction units should establish and improve the project quality management system, the implementation of the post quality responsibility system. Comprehensively do "five strict", strict quality control of building materials, strictly prohibit the use of undocumented materials, strictly prohibit the use of unchecked, side checking; strict implementation of the sample lead the way, the full implementation of the external wall insulation and waterproofing, interior decoration and other craft sample system; strict implementation of quality standards, for residential quality problems, its key links, detail node Strict project acceptance management, the implementation of each process of self-inspection, handover inspection and full-time quality inspectors check the "three inspection" system, the implementation of the decoration division pipeline itemized hidden card acceptance system, and retain the necessary image data, the acceptance data will be entered into the "Zhenli building "; the strict implementation of the function test and entity detection, according to the provisions of the external wall window shower test, roof and waterproofing requirements of the floor water test, outdoor strong and weak power well water test, sewage pipe through the ball test and the external wall insulation entity detection, and retain the necessary image data.
(d) Strengthen the supervision unit quality responsibility. Supervision units should strictly fulfill the duties of project supervision, highlighting the quality of residential quality outstanding issues quality supervision. Review of incoming materials to fulfill the witness sampling; external insulation, ready-mixed concrete, beams and columns node area of the concrete to carry out parallel testing; external window shower test, roofing and waterproofing requirements of the floor storage test, outdoor strong and weak power well storage test, sewage pipe through the ball test and other functional tests to strengthen the witnessing of the side station, and leave the necessary image data.
Four, work arrangements
Special remedial action to carry out the time from now to the end of December 2024, divided into three stages:
(a) mobilization, mobilization, mobilization of the public and the public, the public and the private. ">(a) mobilization and deployment stage (from now until the end of March 2024)
the construction units should combine the actual project to develop a work program, refine the work initiatives, extensive mobilization, careful deployment, organization and publicity, a comprehensive understanding of the special rectification of the objectives, priorities, main tasks, work arrangements and work requirements, comprehensively Start special rectification action, retain the deployment of the work of the publicity image and account information.
(2) check and rectify the stage (April 2024 to November 2024)
1.self-examination and self-correction. Each construction unit first immediately take the lead in organizing the design, construction and supervision to hold a special meeting on governance, according to the requirements of the main tasks of governance of this notice, combined with the actual project, carefully deployed, clear design, construction and supervision of their respective responsibilities, put forward control measures, the formation of the minutes of the meeting, and leave the necessary image information. Secondly, each construction unit organizes design, construction and supervision units to carry out self-examination and self-correction, comprehensive investigation of quality problems, has been constructed but does not meet the requirements should be put forward to rectify the measures for immediate rectification; not yet constructed should be based on the requirements of the measures in this notice to improve the preparation of the construction program and supervision rules, clear different stages of the project's construction, inspection, testing and detection of the focus of the work and the relevant supervision and testing of the plan time to ensure that the special Rectification measures are put into practice. Third, self-examination and self-correction at least once a quarter, and fill out the 2024 city's residential engineering quality improvement special governance action self-examination and self-correction table (Annex 1), respectively, in May, August, November before the end of the district safety and quality station, and the formation of the corresponding special governance action account for inspection.
2. Supervision and inspection. I will supervise and guide the project construction parties responsible for the main body of the organization to prepare practical technical measures, management measures. At the same time comprehensive supervision and inspection, in principle, once a quarter, to carry out entity supervision and testing and functional test supervision and testing or supervision and inspection. The usual management chaos, outstanding quality problems, failure to carry out self-examination and self-correction, failure to take measures to rectify, social complaints of the project to focus on inspection notification and criticism.
3. Demonstration. This year, I will organize and carry out the district quality structure assessment work, merit selection of benchmark projects, set up a typical, and encourage the project organization to hold a residential engineering quality enhancement site, comprehensive guidance to improve the quality of residential engineering and construction quality.
(3) summarize and enhance the stage (December 2024)
The construction unit should carry out a comprehensive summary of the project to carry out special rectification action of the quality of residential engineering, scientific assessment, to find deficiencies, consolidate the effectiveness of the rectification. The formation of long-term management mechanism.
Five, work requirements
(a) raise awareness and strengthen leadership. The construction units should attach great importance to thought and action, strengthen leadership, implementation of the responsibility, careful arrangements, serious deployment, strengthen the research and judgment, identify the weak links and key areas, develop and refine the work measures, clear special governance work focus, steps and requirements, and effectively promote the special rectification work carried out in a solid and effective manner.
(ii) Strengthen the supervision and focus. The construction units to increase the management of the site, especially for residential projects common outstanding problems, to take a high intensity, large frequency of inspection, adhere to the side of the investigation, found one, rectification of one. The Bureau of supervision and sampling of remediation work is not implemented, self-correction is not serious, remediation measures are not effective, the quality of the hidden dangers of the more social complaints, will be notified and criticized, warning interviews, focus on supervision, credit demerit points; cause serious social impact, will be implemented administrative penalties, bad behavior records.
(C) seriously summarize, improve the mechanism. The construction units should seriously summarize the experience, consolidate the results of the special rectification work, make up for the short board, establish and improve the long-term mechanism of quality management of residential projects, and comprehensively improve the quality of residential projects.