Tianjin Binhai Logistics and Processing Zone
Region: Tianjin-Binhai New Area
Address: Empty
County-level
Park level
Empty
Park type
Site Preparation (11 Utility+ Leveling)
Infrastructure
Water price: Empty
Natural gas: Empty
Industrial electricity: Empty
Steam prices: Empty
Sewage treatment: Empty
Chat
Call
Investment Team
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Factory
Warehouse
Office Building
Name
Floor Space
Unit Price
Floor Level
Height
Factory
Warehouse
Office Building
Name
Floor Space
Unit Price
Floor Level
Height
Park Overview
 Introduction to the Control Detailed Plan for the Tianjin Binhai Logistics and Processing Zone

  

  The total planned land area of the Tianjin Binhai Logistics and Processing Zone is approximately 5.73 square kilometers, divided into eastern and western sub-zones. The eastern sub-zone is located east of Gaozhuang Village, with a planned land area of approximately 4.52 square kilometers; the western sub-zone is located north of Yangjiapu Town, with a planned land area of approximately 1.21 square kilometers.

  I. Main Contents of the East Zone Control Plan

  1. Population and Building Scale

  This unit is an industrial zone with no residential population. The total planned building volume is capped at 5,667,700 square meters.

  2. Planning Positioning

  This unit is positioned as an industrial processing base and logistics distribution center led by the environmental protection industry, with its primary functions being industrial production and logistics warehousing.

  3. Land Use Layout Structure

  The plan divides the area into three sub-zones—South, North, and East—delimited by the existing Hanyu Road and the planned Road No. 3. Class I industrial land and Class I logistics and warehousing land are primarily planned along both sides of Hanyu Road.

  4. Road and Transportation Planning

  A road network pattern of three horizontal and three vertical axes is established, forming a basic grid structure to ensure smooth traffic flow and orderly separation of high- and low-speed traffic.The three horizontal roads are Road No. 1, Han-Yu Road, and Road No. 2, while the three vertical roads are Road No. 5, Road No. 4, and Road No. 13. A total of 15 roads are planned within the industrial zone, including 3 urban arterial roads, 3 urban collector roads, and 9 urban local roads. The total road length is approximately 24.9 kilometers (25.2 kilometers when including newly added roads within the industrial zone).
Transportation Location