Notice of the CPC Shanxi Transformation and Comprehensive Reform Demonstration Zone Work Committee on the Issuance of the Implementation Measures of the Recruitment and Landing Operation Mechanism
2024-11-14 00:00

Chapter I General

Article 1 In order to further promote the reform of the mechanism of inviting and falling into one to enhance the efficiency of the project to promote the creation of an optimal business environment, combined with the actual work, the development of the implementation of this approach.

The second general requirement is to establish an "integrated" concept of work, the whole region's work is integrated into the main responsibility for investment and project construction, the "integration" of the main business. Integration of the overall view, the system view into the whole life cycle of investment and project construction, the formation of investment centers, parks, functional departments, platform companies to serve the project of a strong synergy for the transformation of Shanxi Comprehensive Reform Demonstration Zone high-quality development to provide a solid mechanism to support.

Article 3 Basic Principles:

(a) front service, efficient connection. Parks and functional departments of the service front, the program will be studied, land clearing table, three passes and one leveling and other landing protection of the preliminary preparatory work front to the investment stage, the efficient convergence of the signing and landing, significantly reducing the landing time.

(ii) scientific classification, hierarchical decision-making. The establishment of a joint meeting mechanism for hierarchical decision-making, according to the size of the project and the policy needs of the classification of the application, strictly control the project into the area, improve the quality and efficiency of the project into the area.

(3) clarify responsibilities and boundaries. Investment center, parks, functional departments, platform companies in all aspects of the recruitment fall into a specific task all embedded, scientific settings, subdivided and clear; investment promotion center throughout the coordination of scheduling, the formation of a clear boundary, the same pace, the same force of the project to promote the moving car mechanism.

(D) tracking and supervision, dereliction of duty must be investigated. Through the integrated office "13710" supervision and discipline inspection and supervision of the whole process of supervision of the Commission, the "recruitment and fall as one" due to poor execution, shirking responsibilities and other issues that lead to slow progress of the project, which may seriously affect the business environment for serious treatment.

(E) realistic, objective and feasible. The introduction of the project should be based on the actual development of industry and the region's available financial resources, adhere to the ability to live within their means, revenue and expenditure surplus, for different volumes, different scientific and technological content, different industrial track of the project, in a careful examination of the project on the basis of scientific decision-making, in accordance with the law and regulations to give the appropriate amount of policy support.

Chapter II Work Task Force

Article 4 The establishment of the Recruitment of the fall of one work task force is responsible for the recruitment of the fall of one work of the unified leadership, unified research, unified command, analysis, research and resolution of recruitment of the fall of the one mechanism encountered in the process of operation, the overall promotion of the recruitment of the fall of one work Analyze, study and solve the problems encountered in the operation of the mechanism, and promote the overall recruitment and fall of one work to continue to carry out. Work team leader by the party working committee, the management committee as the main leader, deputy leader of the party working committee, the management committee team members as members of the investment center, parks, functional departments, platform companies responsible for the composition.

Article 5 The establishment of the project investment group, project landing group, park service group, responsible for recruiting, landing, investment in the three stages of work; the establishment of the supervision and promotion group, the whole process of project recruitment and fall to supervise. Among them: the project investment group is in charge of investment management management committee leaders as the deputy head of the business environment and government services in charge of the management committee leaders as; project landing group is in charge of planning and natural resources management, infrastructure, utilities, the management committee leaders as the deputy head of the management committee in charge of the review of the design of construction projects as the management committee leaders as; Park services The head of the group is in charge of the park as the leadership of the management committee, deputy head of the park by the person in charge of the group; supervise and promote the head of the group by the deputy secretary of the party working committee, deputy head of the secretary of the discipline inspection and supervision of the working committee as. For major projects to set up a project task force, to solve the project difficulties, and comprehensively protect the project to promote.

Project investment group, project landing group office in the Investment Promotion Center, the director of the Office of the Director of the Investment Promotion Center; park service group office in the park, the director of the Office of the park by the main person in charge of the Office of the Director of the Office of the Director of the Promotion Group is located in the Office of the Office of Comprehensive, the director of the Office of the Director of the Office of the Director of the Office of Comprehensive.

Chapter III Departmental Responsibilities

Article VI In order to better implement the recruitment and fall of the one mechanism, to do the same direction of the various departments, to promote the work of the task force to carry out efficiently, the main responsibilities of the departments are as follows:

(a) Discipline Inspection and Supervision Commission: Responsible for dealing with the operation of the mechanism of recruitment and fall of one of the irregularities and violations of discipline and behavior affecting the business environment.

(2) Comprehensive Office: responsible for the supervision of the project.

(3) Human Resources Department: responsible for talent services and other work.

(4) Financial Management and Operation Department: responsible for the project's comprehensive benefits of re-measurement, in accordance with the law and regulations to complete the disbursement of funds.

(e) Innovation and Development Department: responsible for the development of energy consumption negative list; to provide "standard land" energy consumption control indicators; with the Administrative Approval Bureau to carry out energy-saving review of the project, to seek the views of the Taiyuan Energy Bureau project energy consumption dual-control; responsible for the project's Into the system services and other work, responsible for the provincial development and reform, industry and commerce departments of the business docking, and the establishment of a good project library in the corresponding areas, and do a good job of daily maintenance and updating; responsible for coordinating and promoting the project put into operation, up to the regulation of the relevant work.

(6) Science and Technology Finance Department: responsible for doing a good job in the project to promote scientific and technological services, financial security, etc.; responsible for the listing of the enterprise company's services to guide the work and supervision of financial services; responsible for the declaration of high and new technology, science and technology funds to implement the work.

(7) Construction and Utilities Management Department: according to the needs of the park, responsible for municipal level water supply, power supply, gas supply and heating coordination, docking work, responsible for municipal level sewage treatment plant docking work; responsible for the co-ordination of the supervision of projects under construction.

(H) Administrative Approval Bureau: responsible for assisting the investment sector in accordance with the "Negative List of Market Access" for project access to the study; responsible for the provision of pre-service, a one-time notification of the relevant requirements of the program design; responsible for the joint validation of the construction project design; responsible for the coordination of the park to sign the "standard land", "standard land", "standard land", "standard land" and "standard land", "standard land". Standard land" project investment and construction contract "work; responsible for coordinating the handling of various types of approval procedures, responsible for the integration of procedures, responsible for providing a list of various types of procedures; responsible for the "one network" acceptance work.

(IX) Audit and Legal Affairs Department: responsible for improving the model investment agreement, the need to enter the district decision-making joint meeting to consider the project to carry out the agreement to review the legitimacy of the park with the park to do a good job with the project to exit the legal affairs work.

(10) Department of Emergency Management: responsible for supervising and guiding enterprises to complete the construction project according to law safety facilities "three simultaneous" and occupational disease prevention and treatment facilities "three simultaneous", responsible for Around the production safety, emergency rescue and other matters to do related work.

(xi) Comprehensive Law Enforcement Bureau: before the construction of the construction, a one-time notification of compliance with construction, dust management and other matters; in the construction of the project construction, according to the provisions of the supervision of the project under construction, and continuous tracking services.

(xii) Department of Industrial Planning: responsible for sorting out the planning and current construction situation of the park, and formulating spatial maps of industrial land.

(xiii) Investment Promotion Center: Responsible for coordinating the work of "recruiting and landing as a whole", cooperating with the investment promotion department to serve the project into the area, coordinating the project process management and promoting the process of dealing with issues.

(xiv) Policy Research Center: responsible for coordinating the construction of the region's support policy system, the organization of thematic policy research, the development of policy maps and other work.

(15) Park Service Center: is responsible for industrial development around the park direction to carry out investment, digging into the stock of enterprise reinvestment, do a good job in the construction of project support facilities, local project policy cash, the implementation of the "standard land" project investment and construction contract signed and so on. The contract of "standard land" project investment and construction work.

(16) Investment Service Center: around the direction of their respective investment industry to develop investment maps, investment work.

(xvii) Land Affairs and Reserve Center: responsible for coordinating with the Bureau of Planning and Natural Resources to prepare the annual land transfer plan and annual land supply plan, with the park to coordinate the proposed expropriation of the county (district) department of human resources and social services to carry out the accounting of landless peasants' pension insurance and handle the payment of related costs to the county (district) financial sector special account.

(xviii) Real Estate Registration Center: responsible for coordinating the real estate title certificate.

(xix) Shanxi Fenfei Development Group Co., Ltd: responsible for dynamically combing the information of self-holding factories and buildings, and formulating elemental maps.

(xx) Synthetic Biological Industry Investment and Development Co.

(xxi) Shanxi Chunfen Science and Technology Investment Group Co., Ltd: responsible for coordinating the financial instruments under the company's control to actively carry out market-oriented investment in equity and debt.

(xxii) Shanxi Transformation Industrial Park Group Co., Ltd: responsible for supporting the construction of supporting infrastructure for the Yangqu Park project.

(xxiii) Planning and Natural Resources Bureau: responsible for working with the Land Affairs and Storage Center to prepare the land transfer plan and supply plan, to provide the land scale pre-screening, pre-siting opinions and planning requirements, land transfer, planning conditions verification, according to law and regulations to carry out the work of idling land identified and disposed of, and to handle the change of use of land. The work of the relevant procedures, etc..

(xxiv) Market Supervision Bureau: responsible for organizing the relevant departments to implement the fair competition review system, to carry out fair competition review.

(xxv) Ecological Environment Branch: responsible for environmental protection pre-trial, environmental assessment and other work.

(xxvi) Public Security Branch: responsible for social risk investigation and other work.

Chapter IV: Industrial Direction of the Park

Article 7: Focusing on the "2+1" dominant industries, including advanced manufacturing industry, digital economy and modern service industry, and in accordance with the "Shanxi Transformation and Comprehensive Reform Demonstration Model", the park shall be developed in accordance with the "2+1" dominant industries, including advanced manufacturing industry, digital economy and modern service industry. According to the "Industrial Map of Shanxi Transformation and Comprehensive Reform Demonstration Zone (Taiyuan)", combined with the industrial characteristics of the six parks, the industrial development direction of each park is clearly defined.

(1) Xuefu Park

Digital products manufacturing, digital platform economy, information technology integration and application of the digital economy industry, modern financial and scientific and technological services, modern trade and e-commerce and other modern service industries.

(2) Tanghuai Park

High-end equipment manufacturing industry (mining and engineering special machinery, energy-saving and environmental protection special machinery, transportation equipment, wind power equipment), digital product manufacturing, biomedicine, and modern service industries.

(3) Wuxu Comprehensive Bonded Zone

Aeronautical services, bonded processing, bonded logistics, bonded maintenance, bonded e-commerce, bonded research and development, bonded warehousing.

(4) Science and Technology Innovation City

Digital platform economy, information technology fusion application and other digital economy industries, scientific research platforms, and modern service industries.

(5) Xiahe Park

New energy and applications, battery materials, third-generation semiconductors, engineering special machinery and other high-end equipment manufacturing industry, assembly building industry, biomedicine, logistics and warehousing, conferences and exhibitions and modern service industries such as business. The company's business is also a major player in modern service industries, such as finance.

(6) Yangqu Park

Biomaterials, new energy and applications, battery materials, Xinchuang industry, semiconductor materials, high-end equipment manufacturing, culture and tourism and other modern service industries.

Article VIII of the park in principle, according to the industrial segments of the landing investment projects, service area enterprises in the jurisdiction of the implementation of technological transformation projects. Indeed, for special reasons need to land in the park non-industrial direction of the project, to be landed in the park by the leadership of the Commission in charge of the confirmation of the investment center or to be landed in the park to fulfill the process of entering the area.

Chapter V Merchants center investment industry direction

Article IX Clearly professional investment center's main direction, deep plowing industry chain investment, to avoid disorderly competition, further industrial research, and continue to improve the analysis of the industrial tree, improve the professional ability of the investment team. The investment team's professional ability.

(I) Information and Creation and Big Data Industry Investment Service Center

Digital Economy Industry (Information Technology Integration and Application Industry, Digital Product Manufacturing, Digital Platform Economy) and so on.

(2) International Cooperation Project Investment Service Center

High-end equipment manufacturing industry (mining and engineering special machinery, energy saving and environmental protection special machinery, transportation equipment, wind power equipment), aviation special equipment industry.

(C) new energy industry investment service center

new energy and application industries.

(4) New Materials Industry Investment Service Center

Third-generation semiconductor industry, biomaterials industry, battery materials industry.

(E) Modern Service Industry Investment Service Center

Productive modern service industry, living modern service industry.

Article X. For investment projects that can define the focal point of the investment center, the investment center is in principle only responsible for the direction of the investment industry industrial projects, non-directional industrial projects should be transferred to the corresponding investment center. For the above industrial direction is not covered by the investment center of the investment project, the investment center can docking negotiation, to fulfill the relevant process into the area.

Chapter VI Classification of Investment Projects

Article 11 According to the main body of the investment is divided into two categories: stock enterprise reinvestment projects and new investment projects. Stock of enterprise reinvestment projects into the area by the park is mainly responsible for investment center to do with; new investment projects into the area by the investment center is mainly responsible for investment center, the park to do with.

Article XII of the major investment projects, generally refers to the leading role in the field of the industry, the advanced level of technology, and the comprehensive reform of the industrial development of the zone to produce a significant impact of investment projects. Recognition is divided into two categories: investment of more than 5 billion yuan of investment projects, directly recognized as a major investment projects; projects into the area of decision-making joint meeting study identified as a major investment projects. For investment of more than 5 billion yuan of major investment projects, should be initiated in contract negotiations, contract signing within 15 days from the date of reporting to the Provincial Development and Reform Commission, foreign-invested projects synchronized with a copy of the Department of Commerce; for investment of more than 10 billion yuan of major investment projects, should be initiated in the contract negotiations, the contract signing within 7 days from the date of reporting to the Provincial Development and Reform Commission, in accordance with the provisions of the report to the state procedures.

Chapter VII project investment in the district process

Article XIII of the establishment of the joint meeting process and park decision-making process and the park of simple process of the two types of investment in the district process, whether the project is a new land use for the application of classification.

Article XIV of the investment process into the area is divided into two categories:

(a) Decision-making joint meeting into the area of the process (to consider the new land projects)

1. Investment center, the park's preliminary work

(1) investment center or park docking and inspection of the project unit, with the conditions of the project into the area to form a "letter of intent to enter the project area," "Project Inspection Report," and other materials, please indicate to the leaders in charge and obtain a consensus to continue to promote the project.

(2) Administrative Approval Bureau in accordance with the "Negative List of Market Access" on the project to put forward the views of industry access.

(3) The Investment Promotion Center cooperates to complete the expert review and commercial due diligence.

(4) Formation of the "Feasibility Study Report", "Project General Layout Intentions" and other materials.

(5) Drafting the agreement and reviewed by the lawyer check, sent to the Market Supervision Bureau to carry out fair competition review.

(6) For production projects, the Ecological Environment Sub-bureau to carry out environmental pre-examination.

(7) The Bureau of Planning and Natural Resources provides land scale prequalification, pre-siting opinions and planning requirements.

2. Management Committee in charge of the leadership to convene a meeting of the internal review of the project

(1) Preparation for the meeting

Investment center or park to prepare for the internal review of the project The meeting report information, to the leaders in charge of the application to determine the convening of the internal audit meeting.

For projects that require the services of the platform company, the platform company assigns specialists to intervene in the project research and evaluation, tracking and services.

(2) Content of the meeting

Invitation center or park to report on the basic situation of the project, the participating departments in accordance with the functional responsibilities of the comments, focusing on the feasibility of the project and the elements of security for the study and judgment, put forward to the decision-making of whether or not to submit to the region. The joint meeting to consider the clear views.

(3) Post-meeting arrangements

The investment center or park to complete the "project internal review minutes", reported to the leaders in charge of the signing, and revised to improve the project information.

Investment center or park to the investment promotion center to provide the actual controller of the list of enterprises, by the investment promotion center unified letter to the Public Security Bureau to carry out the work of social risk investigation, the main content of the social risk investigation, including the project unit, the legal representative, the main executives and affiliates of the project unit may appear in the crowd of economic cases and fraud cases and so on. The main content of the social risk investigation includes the project unit, the legal representative, the main executives and the associated companies may be involved in crowded economic cases and fraud cases.

Investment centers or parks to the Audit and Legal Affairs Department to provide legitimacy review of relevant materials, the Audit and Legal Affairs Department to lead the legitimacy review.

The investment center or park docking project units to start the program design of the preliminary work; the park to start the pre-"three passes and one leveling" and table clearing work. For the clearing table work that needs to be disbursed in advance of the demolition funds, the park accounted for the amount of work and demolition assessment, declaration of funds and other related work, financial management and operation of the Department of funds in a timely manner to do a good job of disbursement of funds.

The Administrative Approval Bureau provides one-time notification of administrative approval matters.

The Land Affairs and Reservation Center is responsible for doing a good job of land resumption for non-construction land.

The investment center or park to form the "Internal Audit Report", reported to the supervisory leader and the park to be landed in the supervisory leader to review and sign.

3. Convene a joint decision-making meeting

(1) Preparation before the meeting

Invitation center or park to prepare for the joint meeting of decision-making into the area Reporting materials.

Investment Promotion Center to collect a list of projects to be considered at the joint meeting of the district decision-making, guidance and supervision of investment centers or parks to complete the preparation of materials for the meeting, as well as liaison and to assist in the organization of the meeting of the General Office.

Integrated Office is responsible for contacting the leadership, to determine the meeting time, meeting place and other meeting organization.

(2) meeting content

Management Committee of the main leader presided over the decision-making joint meeting into the area.

Invitation center or park to report on the project, the specific content of the agreement and the process of entry into the area, focusing on reporting on the current situation of the industry, corporate strength, technical level and related recommendations; parks, platforms and companies to report on the elements of security and put forward the views of the other functional departments in accordance with the functional responsibilities of the comments.

The leadership of the management committee to put forward the views of the collective discussion to decide whether the project meets the conditions of the area; recognized as a major investment project, shall be submitted to the party meeting to study.

(3) Post-meeting arrangements

Investment Promotion Center to complete the "Decision-making joint meeting minutes into the area", reported to the main leadership of the management committee to sign.

Investment Promotion Center or Park docking project units to officially start the program design work.

4. The park to fulfill the "three major" procedures for decision-making

"Into the area of decision-making after the issuance of the joint meeting minutes", the park to fulfill the "three major" procedures for decision-making

"Into the area of decision-making after the issuance of the minutes, the park to fulfill the After the issuance of the Minutes of the Joint Meeting for Decision-making on Admission, the Park will fulfill the "Three Major Events" procedure to collectively study the content of the agreement, agree on matters related to the signing of the agreement and promote the landing of the project. After the meeting, the Investment Promotion Center provides the agreement number, and the park completes the signing of the agreement as the signing body. Before signing the agreement, the park to the Audit and Legal Affairs Department, the Ministry of Innovation and Development, the Investment Promotion Center (Key Projects Office) to seek advice, if the project has been issued in the process of entry into the area of the opinion, will not be repeated to seek advice.

For major investment projects identified by the joint meeting of the decision-making into the area, the Investment Promotion Center or the park directly submitted to the CPC Working Committee meeting in accordance with the procedures for consideration. Before the meeting, the investment promotion center led by law firms, accounting firms to carry out due diligence work; investment center or park on the policy claims for preliminary calculations, financial management and operation of the Department of the policy calculations for review; after the meeting, the investment promotion center to provide the agreement number, the park commissioned by the management committee to complete the agreement signing work.

(2) Park simple process (consideration of non-new land projects)

1. Investment Promotion Center, the park's preliminary work

(1) investment promotion Center, the park docking and inspection of the project unit, with the conditions of the project into the region to form a "project into the district letter of intent" "project inspection report" and other materials. The project into the district letter of intent" to be investment center and the park common seal confirmation, and reported to the two sides in charge of the leader to sign.

(2) Administrative Approval Bureau in accordance with the "Negative List of Market Access" on the project to put forward the views of industry access.

(3) The Investment Promotion Center cooperates to complete the expert review and commercial due diligence.

(4) Draft the agreement and send it to the Market Supervision Bureau for fair competition review after the lawyer's review.

(5) For production projects, the Ecological Environment Sub-bureau to carry out environmental pre-examination.

(6) investment center or park to the Investment Promotion Center to provide the list of actual controllers of enterprises, the Investment Promotion Center unified letter to the Public Security Bureau to carry out social risk investigation work, the main content of the social risk investigation, including the project unit, the legal representative, the main executives and affiliates may be related to the crowd of economic cases and fraud cases and so on. The main content of the social risk investigation includes the project unit, legal representatives, key executives and affiliated companies may be involved in crowded economic cases and fraud cases.

2. Convene a meeting to study and judge the project

To land in the park in charge of the leadership of the organization to hold a meeting to study and judge the project, investment centers or parks to report on the basic situation of the project; the parks and functional departments in accordance with the functional responsibilities of the comments; focus on the feasibility of the project and the elements to guarantee the study and judgement of the project. Around the feasibility of the project and the elements of security research and judgment, collective discussion and decision-making project is in line with the conditions of the area, identified as a major investment project, shall be submitted to the decision-making joint meeting of the study area.

The park is responsible for the issuance of the "Minutes of the Project Research and Judgment Meeting" and reported to the leaders in charge for signature.

3. The park to fulfill the "three major" procedures for decision-making

"Project Research and Judgment Minutes" issued by the park to fulfill the "three major" procedures. After the issuance of the Minutes of the Project Research and Judgment Meeting, the Park fulfills the "three major major" procedures to collectively study the text of the agreement, agree on matters related to the signing of the agreement, and promote the project to the ground. After the meeting, the Investment Promotion Center provides the agreement number, and the park completes the signing of the agreement as the signing body. Before signing the agreement, the park to the Audit and Legal Affairs Department, the Ministry of Innovation and Development, the Investment Promotion Center (Key Projects Office) to seek advice, if the project has been issued in the process of entry into the area of the opinion, will not be repeated to seek advice.

For major investment projects identified by the project study and judgment meeting, the investment center or park submitted to the joint meeting of the decision-making process for further consideration, and at the same time, the Audit and Legal Affairs Department to provide the legitimacy of the review of the relevant materials, the Audit and Legal Affairs Department to take the lead in carrying out the legitimacy of the review. The major investment projects approved and recognized by the joint meeting of decision-making on admission shall be submitted to the meeting of the Party Committee for consideration, and the specific process shall be referred to the "process of the joint meeting of decision-making on admission". Decision-making joint meeting to enter the area is not recognized as a major investment projects, by the park to perform the "three major" procedures for collective decision-making and complete the signing of the agreement.

As the Wuxu Comprehensive Bonded Zone is the main position of the region's opening up, involving bonded processing, bonded logistics, bonded maintenance, bonded e-commerce, bonded R & D, bonded warehousing and other types of foreign trade industry, the relevant industry investment, project landing and management work by the Wuxu Comprehensive Bonded Zone Service Center to carry out their own. 

Chapter VIII Promoting the project landing

Article 15 Promoting the project landing, construction, focusing on land clearing, program design, land supply and formalities. In the investment stage to realize the clear table front, to achieve the land supply before the net land transfer standards, compressed project landing time. In the investment stage to achieve the design program before the land supply to complete the design program for the record, with the conditions for entering the field to start construction, shorten the construction cycle. The park has formulated the timetable, mission statement and roadmap for project promotion, submitted them to the office of the project landing team in a timely manner, and updated the progress of the project on a regular basis. The park carries out "full agency services" for the project, and the functional departments cooperate with the park to provide good landing services. Project landing group according to the actual needs of the timely convening of the project landing to promote the meeting, to solve all kinds of problems in the process of project landing.

Article XVI Clearance of the table

(a) start clearing the table

After the project is issued with the opinion of the site, the park will start the work in due course according to the actual situation. "Three passes and one leveling" and table clearing work.

(2) Guaranteeing the clearing of the table

Demolition and relocation of large volume, demolition and relocation of the time is expected to be more than three months of the structure (building), it is recommended to start the demolition and relocation of the work first, with the approval of the park and the leadership of the Finance Management Sub-Committee, to the The Financial Management and Operation Department submits the budget report and organizes the implementation. Financial Management and Operation Department to do a good job of financial security (such as financial security needs to be determined by the Party Working Committee meeting, in the Party Working Committee meeting within 3 days after the financial management and operation of the Department of the budget issued).

Construction and Utilities Management Department in accordance with the needs of the park, is responsible for municipal level water supply, power supply, gas supply and heating coordination, docking work, is responsible for municipal level sewage treatment plant docking work.

(3) Types of Clearance

The types of clearances are specifically divided into five categories: relocation of graves, conventional structures, farmers' houses (home bases), factories and infrastructure.

Relocating graves: the park is responsible for submitting the funding budget and coordinating with the county (district) or relevant units to carry out the relocation of graves in accordance with local customs. For parks without clear relocation standards, the Financial Management and Operation Department is responsible for financial audits to secure funds for relocating graves. The relocation of graves will be completed in about 30 days after the funds are available.

Conventional structures: the park is responsible for the submission of the budget, demolition and relocation, and coordinating with counties (districts) or relevant units to carry out mapping, assessment, and signing of compensation agreements. The Financial Management and Operation Department is responsible for financial auditing and securing funds for demolition and relocation. It will be completed in about 30 days after the funds for demolition and relocation are available.

Farmer's house (house base): the park is responsible for submitting the funding budget, demolition, etc., and coordinating with counties (districts) or relevant units to carry out mapping, posting announcements, registration, signing of compensation agreements, resettlement and other work. In accordance with the demolition and resettlement compensation standards, the Financial Management and Operation Department is responsible for securing compensation funds. It will be completed in about 90 days after the funds are available.

Plant: The park is responsible for submitting the fund budget, demolition and relocation, and coordinating with counties (districts) or relevant units to carry out mapping, assessment, and signing of compensation agreements. The Financial Management and Operation Department is responsible for financial review and securing funds for demolition and relocation. It will be completed in about 45 days after the funds are available.

Infrastructure:

Poles

Parks are responsible for submitting funding budgets and carrying out specific relocation work. According to "the park to implement the property rights unit - the development of the relocation program - the construction unit according to the program to report the budget - financial review (must be completed within one week of the audit) - signing an agreement or contract (after the signing of the contract, subject to the Ministry of Finance, Management and Operation of the funds disbursed) (After signing the contract, the Ministry of Financial Management and Operation must allocate the funds to carry out the follow-up work) - report the power outage plan - relocation implementation", the work order is carried out, and the work takes about 3 months. The Ministry of Finance, Management and Operation guarantees the funds for the relocation.

Gas, water supply, heating, power supply, communications and other underground pipelines and facilities

The park is responsible for submitting the funding budget to carry out specific relocation work. According to "the park to implement the property rights unit - the development of the relocation program - the construction unit according to the program to report the budget - financial review (must be completed within one week of the audit) - signing an agreement or contract (after the signing of the contract, subject to the Ministry of Finance, Management and Operation of the funds allocated) (After signing the contract, the Ministry of Financial Management and Operation's funds must be disbursed before any subsequent work can be carried out) - implementation of the relocation", and the work will take about three months. The Ministry of Finance, Management and Operation guarantees the funds for the relocation.

The Park will send a photo of the completed clearance form to the Investment Promotion Center as an attachment to the notice of land supply.

Article 17 Program Design Work

(1) Starting Design

After the project is issued with a site, the project docking department is responsible for coordinating the project to start program design. units to start the program design, the park is responsible for coordinating the project units to complete the program for the record.

(2) work requirements

Administrative Approval Bureau is responsible for organizing the construction engineering design program joint research and validation program.

The Park urges the project unit to provide the Administrative Approval Bureau with the finalized construction engineering design plan, the application form for the human defense design conditions and the construction project human defense engineering design commitment to the human defense design conditions; supervise the project unit to carry out the construction drawings design. State-owned enterprises can start the work after obtaining the project site.

Industrial land use projects landing in Yangqu Park, Yangqu Industrial Park Service Center in accordance with the existing process to promote their own program design filing and other related work.

Article 18 Land Supply

(1) Arrangement of Land Supply for Construction Land

After the project contract is signed, the park is responsible for informing the Investment Promotion Center to start land supply in principle. Investment Promotion Center to start the land supply, with a photo of the completion of the clearing table, immediately.

The Department of Innovation and Development is responsible for the provision of "standard land" energy consumption control indicators, and immediately processed.

Investment Promotion Center (IPC) coordinates with the Bureau of Planning and Natural Resources (BPNR) to initiate the land transfer process, which will be processed immediately.

The Bureau of Planning and Natural Resources organizes and implements the preparation and submission of the land grant proposal for approval, which is completed in 15 working days.

Land listing to signing the land grant contract is completed in 43 days.

The Administrative Approval Bureau coordinated with the park to complete the signing of the investment and construction contract for the "standard land" project, which was completed within one week.

(2) Agricultural land resumption work arrangements

involving agricultural land resumption, in order to accelerate the project landing, the need to carry out land resumption work in advance.

The Bureau of Planning and Natural Resources is responsible for formulating the annual land transfer plan and land supply plan to ensure that the comprehensive reform demonstration zone has a certain amount of construction land each year to ensure that the project land demand.

The site selection is in principle on state-owned construction land. If the site is selected on non-state-owned construction land, the Bureau of Planning and Natural Resources will be responsible for initiating the land transfer and requisitioning work in due course after the pre-site selection opinion is issued.

After the Bureau of Planning and Natural Resources starts the work of agricultural land transfer and expropriation, the park is responsible for coordinating with the county (district) to carry out the related work of posting announcements, investigating the land status quo, assessing the risk of stabilization, demolishing and relocating the ground attachment and clearing up the ground as well as the commercial financial management and operation department to charge the expenses.

The Land Affairs and Reserve Center is responsible for coordinating with the county (district) to carry out the accounting of lost land security, the Ministry of Human Resources, the Park with.

The Department of Financial Management and Operation is responsible for pre-depositing and disbursing the compensation and resettlement fees, resettlement subsidies, compensation costs for rural villagers' residences, other aboveground attachments and seedlings, and social security costs for the farmers whose land is to be expropriated.

After the completion of the agricultural land transfer and land acquisition work, land will be supplied in accordance with the process of land supply for construction land.

Article 19: Handling of Procedures

The Administrative Approval Bureau is responsible for coordinating all kinds of approval procedures, for the integration of the procedures, and for providing the list of all kinds of procedures. The park provides all the project landing stage "full agency" services.

(1) Company Registration

The park assists enterprises in submitting relevant materials to the market entity registration authority to complete the company registration.

(2) Project Formation

The park assists the project unit in submitting relevant materials to the Administrative Approval Bureau for the filing and approval of enterprise investment projects.

(3) EIA

The Park urges the project unit to prepare the environmental impact report of the construction project after the project is filed, and assists the project unit in submitting the report to the Administrative Appraisal Bureau for approval.

(4) Project Energy Conservation Review

The Department of Innovation and Development cooperates with the Administrative Approval Bureau to carry out the project energy conservation review, and solicits opinions on dual-control of energy consumption of the project from the Taiyuan Energy Bureau. The park assists project units to submit relevant materials to the Administrative Approval Bureau for review.

(E) Soil and water conservation program for production and construction projects

The Park assists the project unit in hiring a professional third-party to prepare the soil and water conservation program, and assists the project unit in submitting the relevant materials to the Administrative Approval Bureau for review.

(F) Construction Permit for "Foundation Pit Support and Earth Excavation"

After signing the land grant contract, the Park will assist the project unit in submitting materials for the "Foundation Pit Support and Earth Excavation" stage to the Administrative Approval Bureau. After signing the land grant contract, the park will assist the project unit in submitting materials to the Administrative Approval Bureau for the construction license of the "Foundation Pit Support and Earth Excavation" stage.

(7) Human Defense Design Conditions

After the design plan is filed, the park assists the project unit to provide the Administrative Approval Bureau with the finalized construction design plan, the application form for the human defense design conditions, and the commitment for the design of the construction project's human defense engineering.

(H) Land use planning license

Industrial, scientific research and other projects, after the signing of the land grant contract, in accordance with the "Shanxi Transformation Comprehensive Reform Demonstration Zone part of the planning and implementation of management work memorandum," the park to assist the project unit to the Administrative Approval Bureau to submit relevant information for land use planning license.

(IX) Real Estate Certificate

After signing the land grant contract and paying the land grant premiums and taxes, the park will assist the project unit in submitting the application materials to the Real Estate Registration Center to apply for the certificate of ownership of real estate.

(10) Engineering Planning License

Industrial, scientific research and other projects, after signing the land grant contract, in accordance with the "Shanxi Transformation Comprehensive Reform Demonstration Zone part of the planning and implementation of management work memorandum", the park to assist the project unit to the Administrative Approval Bureau to submit relevant information for the project planning license.

(XI) Construction Permit

After the Construction Project Planning Permit is issued, the park will assist the project unit to provide relevant materials to the Administrative Approval Bureau for payment of infrastructure support fee and construction project construction permit procedures. Special construction projects should be fire design review; other construction projects should be provided to meet the construction needs of fire design drawings and technical information.

(xii) other work

Ministry of Emergency Management is responsible for the construction project safety facilities "three at the same time", Comprehensive Law Enforcement Bureau in accordance with the project building construction sites The "six hundred percent" requirement for enterprises to do a good job of pre-service.

Chapter IX: Service Guarantee of the Park

Article 20: Empowering the park to provide full life-cycle services for the project is an important part of improving the quality of services. By empowering the park, embedding the functions, enhancing the vitality of the park services, stimulating the park service dynamics, guaranteeing the supporting services and policy fulfillment, etc., and comprehensively promoting the benign development from project to enterprise, from nursery to industrialization, as well as being responsible for the disposal of project termination and withdrawal, and doing a good job of revitalizing the work related to the low utility land. Relevant functional departments cooperate with the park to provide financial security, financial services, statistical guidance, project supervision, safety production and other services.

(I) Park services

1. The Investment Promotion Center will put into operation the list of projects (including the "three a batch" of put into operation the project) in a timely manner to the Ministry of Innovation and Development, to ensure that the project services are constantly on file, to form a "three batch" of projects. The center will send the list of commissioned projects (including the "three batch" of commissioned projects) to the Ministry of Innovation and Development in a timely manner to ensure that the project services are constantly on schedule, forming a benign delivery mechanism from "commissioned projects" to "enterprises in production".

2. The park carries out services for the project after landing, helps to solve all kinds of problems encountered in the construction process, assists the project unit to handle the subsequent procedures, and is responsible for promoting the project into the system, reach the regulation.

3. Functional departments cooperate with the park to complete the various types of approval procedures for the project, factor protection, industry supervision and other aspects of guidance and assistance.

(2) Performance and Supervision

The Park, together with the relevant departments, is responsible for the implementation of the relevant terms and conditions agreed in the "Project Investment and Development Agreement" and the "Standard Land" Project Investment and Construction Contract. The park, together with the relevant functional departments, is responsible for implementing the relevant terms and contents agreed in the Project Investment and Development Agreement and the Standard Land Project Investment and Construction Contract, and doing a good job in the fulfillment of the agreement and the contract, supervision and other work, and regularly carrying out the evaluation of the comprehensive benefits of the project's landing timeframe, investment intensity, output per mu, actual contribution, creation of employment, and the evaluation of the performance of enterprises.

Article 21 policy cash

(a) The park is responsible for the transfer of projects in the territory of the project after the realization of the project policy.

(2) The Ministry of Finance Management and Operation carries out the established policies (agreements) in accordance with the law, coordinates the funds, and guarantees the realization of policies.

(c) The Administrative Approval Bureau is responsible for the acceptance of the "one network".

Article 22 Project Exit

(a) After the project is no longer implemented, the park took the lead in organizing the relevant functional departments to carry out research and judgment, and to do a good job of project termination, exit acceptance and disposal work.

(2) The Audit and Legal Affairs Department cooperates with the park to do the legal affairs of the project exit.

Article 23: Revitalization of Low-utility Land and Idle Land

(1) The Bureau of Planning and Natural Resources, in accordance with the relevant national policies, will formulate and promulgate the relevant work plan, led by the Park with the cooperation of the relevant departments, to revitalize low-utility land within the jurisdiction, and to provide the relevant information to the Park. Low-utility land within the area, and dynamic supervision of the project land use purposes.

(2) The Bureau of Planning and Natural Resources is responsible for coordinating and promoting the disposal of unused land, with the cooperation of the Park Service Center and relevant departments.

Chapter X Supervision and Promotion

Article 24 The Supervision and Promotion Group is responsible for supervising the whole process of project signing, landing, starting, entering into the system, construction, commissioning, and reaching production.

(a) The Investment Promotion Center is responsible for collecting all kinds of problems encountered in the process of project promotion, and organizing and holding thematic coordination meetings, determining the responsible units, and formulating measures to solve the problem; it is responsible for supervising the relevant units in the stage of project attraction, landing, and park service to negotiate, signing, landing, starting, and servicing of the progress of the project. The situation is recorded in the investment promotion platform.

(ii) the integrated office will be included in the 13710 supervision platform for supervision.

(c) Discipline Inspection and Supervision Work Committee of the supervisory process found in the course of inaction, inaction, or violations of discipline and law to be disposed of.

Chapter XI Supplementary Provisions

Article 25 The projects entered into the cooperative park shall refer to the process of entry into the zone under these measures. Commercial projects belonging to the direction of the dominant industry can refer to the entry process of these measures to consider the current situation of the project's industry, enterprise strength, technology level and other circumstances and sign an agreement, and the rest of the work in accordance with the current process of commercial land use.

Article 26 These measures shall be interpreted by the Party and Work Committee of Shanxi Transformation and Comprehensive Reform Demonstration Zone, and the specific interpretation work shall be undertaken by the Investment Promotion Center.

Article 27 These measures shall come into force on the date of issuance, and the "CPC Shanxi Transformation and Reform Demonstration Zone Working Committee on the implementation of the mechanism for the implementation of the recruitment of the fall of the one (for trial implementation)" (Jin comprehensive demonstration of the work of the hair 〔2023〕 No. 20) shall be abolished at the same time.