Investment Team
Link Organization
Sun Zheng Business Development Manager
Correct
Precise market insights and efficient execution to help projects land quickly
Call
Cao Cheng Business Development Representative
Correct
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Call
For Lease
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | |
|---|---|---|---|---|---|
![]() | |||||
For Sale
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | ||
|---|---|---|---|---|---|---|
![]() | ||||||
Park Overview
【Developer】Nanjing Jiangnan Circular Economy Investment and Development Co., Ltd. (Binhai Investment, Shandong Road & Bridge, Shandong Expressway, Mu'an Capital)
【Operator】China Energy Conservation and Environmental Protection Group Co., Ltd.
【Development Model】EOD (Ecology and Environment-Oriented) Industrial Development Project
【Target Industries】New materials manufacturing, next-generation information technology, high-end equipment manufacturing
【Investment Policies】To be determined on a case-by-case basis according to the industry, scale, and nature of the client company.
【Delivery Schedule】Phase 1 expected to be delivered by the end of 2026
-----------------------------------------------
【Project Location】North of Weisi Road and west of Ecological Avenue, Jiangning Binjiang Development Zone, Nanjing
【Land Use】M2 industrial land, suitable for low-emission industries; a wastewater treatment plant will be established within the project to significantly reduce enterprises’ pollution control costs
【Project Scale】The park covers an area of 3.82 square kilometers, with a planned factory building floor area of 619,900 square meters
【Location Advantages】Located 25 kilometers from downtown Nanjing and 8 kilometers from Ma’anshan City, Anhui Province, the park serves as a key strategic hub for Nanjing’s Yangtze River development strategy and acts as a bridgehead for cooperation between Jiangsu and Anhui provinces and the joint development of the Nanjing Metropolitan Area
【Transportation】The area is traversed by a major transportation network formed by the Ningwu Expressway, National Highway 205, and National Highway 235. It is adjacent to Jiangning West Station and Tongjing Port, offering superior transportation access
【Multimodal Transportation】Approximately 40 km from Lukou International Airport and 2.4 km from the China National Grain Reserves Corporation (CNGRC) Wharf
【Development Offerings】Phase 1 of Plot 3 comprises four 4-story industrial buildings, available for sale as a whole or in separate units
【Building 01】4 stories, total area of 13,700 square meters; floor area ranges from 1,500 to 3,300 square meters; first-floor ceiling height is 9 meters; floors 2–4 have a ceiling height of 4.8 meters; column spacing is 8.4 meters; equipped with 4 freight elevators and 2 passenger elevators
[Building 02] 4 stories, total area 10,095 sqm, floor area 1,000–2,500 sqm per level, ground floor ceiling height 7.8 meters, 2nd–4th floor ceiling height 4.8 meters, column spacing 8.4 meters, equipped with 4 freight elevators + 2 passenger elevators
[Building 03] 4 stories, total area 11,500 sq. m, floor area 1,200–2,800 sq. m per floor, first-floor ceiling height 7.8 m, 2nd–4th floor ceiling height 4.8 m, column spacing 8.4 m, equipped with 4 freight elevators + 2 passenger elevators
[Building 04] 4 stories, total area 11,500 sq m, floor area 1,200 sq m per level, ground floor ceiling height 5.4 m, 2nd–4th floor ceiling height 4.5 m, column spacing 8.4 m, equipped with 1 freight elevator + 1 passenger elevator
【Operator】China Energy Conservation and Environmental Protection Group Co., Ltd.
【Development Model】EOD (Ecology and Environment-Oriented) Industrial Development Project
【Target Industries】New materials manufacturing, next-generation information technology, high-end equipment manufacturing
【Investment Policies】To be determined on a case-by-case basis according to the industry, scale, and nature of the client company.
【Delivery Schedule】Phase 1 expected to be delivered by the end of 2026
-----------------------------------------------
【Project Location】North of Weisi Road and west of Ecological Avenue, Jiangning Binjiang Development Zone, Nanjing
【Land Use】M2 industrial land, suitable for low-emission industries; a wastewater treatment plant will be established within the project to significantly reduce enterprises’ pollution control costs
【Project Scale】The park covers an area of 3.82 square kilometers, with a planned factory building floor area of 619,900 square meters
【Location Advantages】Located 25 kilometers from downtown Nanjing and 8 kilometers from Ma’anshan City, Anhui Province, the park serves as a key strategic hub for Nanjing’s Yangtze River development strategy and acts as a bridgehead for cooperation between Jiangsu and Anhui provinces and the joint development of the Nanjing Metropolitan Area
【Transportation】The area is traversed by a major transportation network formed by the Ningwu Expressway, National Highway 205, and National Highway 235. It is adjacent to Jiangning West Station and Tongjing Port, offering superior transportation access
【Multimodal Transportation】Approximately 40 km from Lukou International Airport and 2.4 km from the China National Grain Reserves Corporation (CNGRC) Wharf
【Development Offerings】Phase 1 of Plot 3 comprises four 4-story industrial buildings, available for sale as a whole or in separate units
【Building 01】4 stories, total area of 13,700 square meters; floor area ranges from 1,500 to 3,300 square meters; first-floor ceiling height is 9 meters; floors 2–4 have a ceiling height of 4.8 meters; column spacing is 8.4 meters; equipped with 4 freight elevators and 2 passenger elevators
[Building 02] 4 stories, total area 10,095 sqm, floor area 1,000–2,500 sqm per level, ground floor ceiling height 7.8 meters, 2nd–4th floor ceiling height 4.8 meters, column spacing 8.4 meters, equipped with 4 freight elevators + 2 passenger elevators
[Building 03] 4 stories, total area 11,500 sq. m, floor area 1,200–2,800 sq. m per floor, first-floor ceiling height 7.8 m, 2nd–4th floor ceiling height 4.8 m, column spacing 8.4 m, equipped with 4 freight elevators + 2 passenger elevators
[Building 04] 4 stories, total area 11,500 sq m, floor area 1,200 sq m per level, ground floor ceiling height 5.4 m, 2nd–4th floor ceiling height 4.5 m, column spacing 8.4 m, equipped with 1 freight elevator + 1 passenger elevator
Transportation Location
Return to location
- Highway
- Port
- Airport
- Logistics
- Life
region
trade
medical
school
travel













