2023 Huaibei Hi-tech Zone Civilized City Creation Special Rectification and Enhancement Action Plan
2023-05-18 00:00

In order to further do a good job in the creation of civilization in the high-tech zone, based on the "2023 Huaibei City civilized city to create special rectification and enhancement of the action plan", combined with the actuality of the high-tech zone in Huaibei, to formulate the "2023 Huaibei High-tech Zone civilized city to create special rectification and enhancement of the action plan", specifically as follows:

One, guiding ideology

In-depth study and propaganda and implementation of Xi Jinping's new era of Chinese Socialist thought with characteristics of Xi Jinping in the new era of China and the spirit of the 20th Party Congress, with the goal of building a civilized city with firm beliefs, virtue, culture, harmony and livability, and people's satisfaction, to promote the implementation of five remedial actions and one upgrading action, to speed up the construction of modernized and beautiful Huaibei to provide a strong spiritual force and a good social environment.

Second, the main tasks

(a) 5 special rectification action.

1. Property management special rectification action. Against the property bidding documents and contracts, strict property management performance assessment; to promote the standardization of factory buildings, Longhu New Village, the management committee office area and the park and other property management optimization and then upgrade to create the assessment standards. p>2. Aerial pipeline special rectification action. Park pipeline adhere to the principle of "should be as far as possible into the" principle, give priority to take into the ground into the pipe into the groove and other ways to rectify the clutter, worn out and damaged, there are hidden safety hazards, but the need to continue to use the aerial pipeline, re-replace and standardize the setup, so that the aerial pipeline safety, aesthetically pleasing.

(Leader: Li Wencai      Responsible unit: Land Planning and Construction Bureau)

3. Outdoor structures special rectification action. Strictly enforce the design, construction standards and approval procedures, standardize outdoor structures set up. 8 before the end of the completion of the various types of illegal outdoor structures, outdoor advertising signage facilities and various types of construction enclosure investigation and rectification.

(Leader: Li Wencai      Responsible unit: Land Planning and Construction Bureau)

4. Parking order special rectification action. Standardize the setting of parking spaces; standardize the management of motor vehicles and non-motorized parking order; increase the management of illegal parking vehicles.

(Leader: Ma Wanshan      Responsible units: Public Security Bureau, Land Planning and Construction Bureau)

5. "Door responsibility system" management of special rectification action. The "three bags in front of the door" work to deepen and enhance the refinement of the "door responsibility system," the main responsibility for the management of the city's environmental health, so as not to pile up and put, not building, not scribbling, not hanging sunshine, not damage to the public property, to do the units along the streets of the normalized management.

(Leader: Li Wencai      Responsible unit: Land Planning and Construction Bureau)

(B) Park environment overall enhancement action

To carry out the demolition of haphazard construction, graffiti hanging cleanup, parking and remediation, digging and stealing supervision, infrastructure maintenance, plant facade maintenance, Publicity to create an atmosphere of special work, to achieve the park "garden appearance" "factory appearance" clean, neat and orderly work objectives; to carry out parks, transportation stations, commercial streets, the management committee office building and other key areas of fine cleaning action, the park road using the The roads in the park adopt the mechanized mode of operation of "flushing, washing, sweeping and sucking" to achieve the goal of controlling the accumulation of dust on the roads, and comprehensively improve the depth of the park's cleaning efforts. The existing greening facilities to strengthen the management and upgrading and upgrading, according to local conditions to create a park micro-landscape.

(Leader: Li Wencai      Responsible units: Land Planning and Construction Bureau, Social Welfare Development Bureau)

Objective:

1. Create a civilized demonstration road. Longwang Road for strict control, in accordance with the standards of civilized neighborhood efforts to create a civilized demonstration road in the High-tech Zone.

(Leader: Li Wencai      Responsible units: Land Planning and Construction Bureau, Social Welfare Development Bureau)

2. Create 2 civilized demonstration plant and 2 civilized demonstration workshop. Wang can power plant and Long Bo electric two enterprises to focus on guidance, guidance, in accordance with the civilized factory and workshop standards, efforts to create, create a civilized demonstration of high-tech zone factory and workshop.   

(Leader: Zhao Ming         Responsible units: Social Business Development Bureau, Safety Supervision Branch)

3. Create a zombie enterprise maintenance and management of the demonstration of plant. Anhui Baoguang Steel Structure Company plant maintenance management, efforts to create a zombie enterprise maintenance management demonstration model. The responsible units should be in accordance with the requirements of the work, clear work measures, agreed by the leaders in charge of the implementation.

(ii) centralized promotion (early April to late August). Each unit should check the problems against the standard, implement the work responsibility, and adhere to the side of the investigation and reform, and to reflect on the third.

(C) consolidation and enhancement (early September to the end of December). The responsible units to promote the creation of a normal and effective work.

Four, work requirements

(a) adhere to the high level of promotion. The establishment of the management committee leadership to lead the promotion of the work mechanism, in charge of the field of rectification and enhancement of the action to strengthen supervision, to ensure that the implementation of the work of the landing.

(ii) refine the safeguard measures. The responsible units to refine the time nodes, clear work responsibilities, so that everything has to be implemented, everything is effective; to strengthen the problem of investigation, accounting and pinpointing.

(3) Raise the benchmark. Each unit should be benchmarked against the "National Civilized City Evaluation System" and "Huaibei City to create a national civilized model city three-year action plan", benchmarked against the creation of advanced civilized cities, reasonable policy, and promote the level of civilized creation of high-tech zones and then enhance.


related party
The policies involved in this website are widely collected from various public channels, except for indicating originality
Recommend Carrier