Investment Team
Binding Unit
Jin Liang Industrial Development Consultant
correct
Familiar with market dynamics, good at digging out quality projects, and promote cooperation with professional services.
Call
For Lease
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | |
|---|---|---|---|---|---|
![]() | |||||
For Sale
Factory
Warehouse
Office Building
| Name | Floor Space | Unit Price | Floor Level | Height | ||
|---|---|---|---|---|---|---|
![]() | ||||||
Park Overview
Lian Dong U Valley · Digital Security Industrial Base is a high-quality industrial facility located within the National Cybersecurity Industrial Park (Tongzhou Park) in Xiji Town, Tongzhou District, the Beijing Sub-center. Focusing on core industries such as digital security, technological innovation, and smart manufacturing, it is dedicated to becoming the only commercial production-oriented industrial park in southern Beijing.
Location: Xiji, Tongzhou Economic and Technological Development Zone
Project Overview:Total site area: approximately 36.6 mu (about 24,400 square meters); planned total floor area: approximately 29,700 square meters; floor area ratio: 1.20; low-density layout ensures an optimal production and R&D environment for enterprises
Product Structure: 3-story standalone or semi-detached factory buildings, with floor areas ranging from 1,500 to 3,700 square meters, suitable for the customized needs of medium-sized technology manufacturing and R&D enterprises
Building Specifications:
Ground floor ceiling height: 7.2 meters; standard floors: 5.1 meters; top floor: 4.5 meters, accommodating heavy equipment installation and flexible space utilization
Floor load capacity: Ground floor: 2 t/㎡; standard floors: 800 kg/㎡; top floor: 500 kg/㎡, suitable for integrated production, warehousing, and R&D functions
Property Rights: State-owned industrial land with a 50-year independent property right, supporting corporate asset registration and long-term development
Payment Options: Bank mortgage loans are available; qualified enterprises may secure a 30% down payment and 70% loan, with a maximum loan term of 10 years, alleviating financial pressure
Transportation & Location:
Adjacent to the Jingha Expressway entrance (only 800 meters away), 2.4 kilometers from the Capital Ring Expressway exit, providing convenient access to Yizhuang, the Beijing Municipal Government, and two major international airports (34 kilometers to Capital Airport, 54 kilometers to Daxing Airport)
Bus routes include T76, T16, 810, T39, and T41, enhancing commuting convenience for employees
Industrial Focus: Focuses on the production and manufacturing of core components for digital security network equipment, the commercialization of pilot-scale research results, high-end equipment manufacturing, and software and information services. Collaborates with research platforms such as the Beijing Research Institute of Northwestern Polytechnical University to build an integrated "industry-academia-research-application" ecosystem
Development and Operation: Developed and operated by Lian Dong Group, a leading national industrial park operator with over 450 parks across 83 cities serving more than 16,000 technology-based enterprises, possessing strong capabilities in industrial resource integration and operational services
Construction Progress: The project completed filing procedures and commenced construction in 2024, with completion and commissioning scheduled for September 2025. Total investment amounts to approximately 240 million yuan
Location: Xiji, Tongzhou Economic and Technological Development Zone
Project Overview:Total site area: approximately 36.6 mu (about 24,400 square meters); planned total floor area: approximately 29,700 square meters; floor area ratio: 1.20; low-density layout ensures an optimal production and R&D environment for enterprises
Product Structure: 3-story standalone or semi-detached factory buildings, with floor areas ranging from 1,500 to 3,700 square meters, suitable for the customized needs of medium-sized technology manufacturing and R&D enterprises
Building Specifications:
Ground floor ceiling height: 7.2 meters; standard floors: 5.1 meters; top floor: 4.5 meters, accommodating heavy equipment installation and flexible space utilization
Floor load capacity: Ground floor: 2 t/㎡; standard floors: 800 kg/㎡; top floor: 500 kg/㎡, suitable for integrated production, warehousing, and R&D functions
Property Rights: State-owned industrial land with a 50-year independent property right, supporting corporate asset registration and long-term development
Payment Options: Bank mortgage loans are available; qualified enterprises may secure a 30% down payment and 70% loan, with a maximum loan term of 10 years, alleviating financial pressure
Transportation & Location:
Adjacent to the Jingha Expressway entrance (only 800 meters away), 2.4 kilometers from the Capital Ring Expressway exit, providing convenient access to Yizhuang, the Beijing Municipal Government, and two major international airports (34 kilometers to Capital Airport, 54 kilometers to Daxing Airport)
Bus routes include T76, T16, 810, T39, and T41, enhancing commuting convenience for employees
Industrial Focus: Focuses on the production and manufacturing of core components for digital security network equipment, the commercialization of pilot-scale research results, high-end equipment manufacturing, and software and information services. Collaborates with research platforms such as the Beijing Research Institute of Northwestern Polytechnical University to build an integrated "industry-academia-research-application" ecosystem
Development and Operation: Developed and operated by Lian Dong Group, a leading national industrial park operator with over 450 parks across 83 cities serving more than 16,000 technology-based enterprises, possessing strong capabilities in industrial resource integration and operational services
Construction Progress: The project completed filing procedures and commenced construction in 2024, with completion and commissioning scheduled for September 2025. Total investment amounts to approximately 240 million yuan
Transportation Location
Return to location
- Highway
- Port
- Airport
- Logistics
- Life
region
trade
medical
school
travel